Lighting the way at Pikup Padel.
Twelve exterior emergency fittings installed along the venue’s access route, with a new circuit and practical lighting controls.
Discuss a project
An active venue. A clear route.
Pikup Padel needed emergency lighting along an exterior route around its facility. Sections are affected by trees and changing natural light, so the layout and controls were planned for the site.

From materials to cable route.
We prepared the fittings and ran the cable through the building before connecting the new lighting circuit.


Both directors on the tools.
Andrew and Glenn carried out the installation themselves, from the circuit work to mounting the exterior fittings.




Designed around the route.
A photocell and programmable time switch manage normal operation. A key switch gives the client a practical way to test the system.



A complete run of 12 fittings.
The exterior route now has the agreed emergency lighting installation. The completed circuit was checked, and the controls were demonstrated to the client.

Directors who turn up and do the job.
Tynevolt is run by Andrew and Glenn. You speak directly to the people responsible for the work.